Tap-Tight P Type Binding【1-16,000 Pieces Per Package】 (CSPBDHP-STN-TPT2.3-16)

Tap-Tight P Type Binding CSPBDHP-STN-TPT2.3-16
  • Promotional pricing ends 30/11/2024
  • Volume Discount

Product Details:

Manufacturer part number: CSPBDHP-STN-TPT2.3-16

Brand: SUNCO

Price: 83.59

Delivery time: 14 Days


Technical Data:

Screw Nominal (M): 2.3

Length L (mm): 16

Material: [Steel] Steel

Surface Treatment: [Nickel Plating] Nickel Plating

Sales Unit: Box/Package


Part Number

Once your search is narrowed to one product,
the corresponding part number is displayed here.

CSPBDHP-STN-TPT2.3-16

Part Number
CSPBDHP-STN-TPT2.3-16
Part Number
Standard Unit Price
Number of pc(s). included in pkg.Minimum order quantityVolume Discount
Standard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Material Surface Treatment Sales Unit

83.59 €

4,500 Pieces Per Package

1 pack 14 Days 102.316[Steel] Steel[Nickel Plating] Nickel PlatingBox/Package

Loading...

  1. 1

Basic information

Detailed Shape Bind Mounting Hole Shape Phillips Head Tip Shape Flat End
Thread Type Tap-Tight Basic Shape Standard (Round)

This page is Tap-Tight P Type Binding, part number CSPBDHP-STN-TPT2.3-16.
You can find the detail information about specifications and dimensions on part number CSPBDHP-STN-TPT2.3-16.

Variation of this product

Part Number
CSPBDHFP-ST3W-TPT4-18
CSPBDHFP-ST3W-TPT4-20
CSPBDHFP-STC-TPT3-14
CSPBDHP-STN-TPT2.3-8
CSPBDHP-STN-TPT2.5-10
CSPBDHP-STN-TPT2.5-6
Part NumberStandard Unit PriceNumber of pc(s). included in pkg.Minimum order quantityVolume DiscountStandard
Shipping Days
?
RoHSScrew Nominal (M) Length L (mm) Material Surface Treatment Sales Unit

65.78 €

1,000 Pieces Per Package

1 pack 6 Days 10418[Steel] Steel[Trivalent Chromate] Trivalent WhiteBox/Package

66.68 €

1,000 Pieces Per Package

1 pack 6 Days 10420[Steel] Steel[Trivalent Chromate] Trivalent WhiteBox/Package

64.83 €

2,500 Pieces Per Package

1 pack 6 Days -314[Steel] Steel[Chromate Plating] Chromate PlatingBox/Package

111.74 €

8,000 Pieces Per Package

1 pack 6 Days 102.38[Steel] Steel[Nickel Plating] Nickel PlatingBox/Package

96.90 €

5,000 Pieces Per Package

1 pack 14 Days 102.510[Steel] Steel[Nickel Plating] Nickel PlatingBox/Package

107.07 €

7,000 Pieces Per Package

1 pack 6 Days 102.56[Steel] Steel[Nickel Plating] Nickel PlatingBox/Package

Tech Support