Part Number
Once your search is narrowed to one product,
the corresponding part number is displayed here.
Part Number
|
---|
21080-080 |
21080-0811 |
21080-0812 |
21080-0813 |
21080-0814 |
21080-0821 |
21080-0822 |
21080-0823 |
21080-0824 |
21080-120 |
21080-1211 |
21080-1212 |
21080-1213 |
21080-1214 |
21080-1221 |
21080-1222 |
21080-1223 |
21080-1224 |
Part Number |
Standard Unit Price
| Minimum order quantity | Volume Discount | Form | Form definition | D3 (mm) | D4 (mm) | D5 (mm) | L (mm) | L1 (mm) | L2 (mm) | L3 (mm) | L4 (mm) | L6 (mm) | Mx (Nm) | Mz (Nm) | My (Nm) | M1 (Nm) | M2 (Nm) | F2 (N) | F3 (N) | B1 (mm) | B2 (mm) | B (mm) | H (mm) | H1 (mm) | H2 (mm) | H3 (mm) | H4 (mm) | Travel S (mm) | Size | Weight (ERP) (kg) | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
663.64 € | 1 | 4 Days | A | Without motor | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.3888 | ||
792.42 € | 1 | 4 Days | B | With stepper motor | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7220 | ||
792.42 € | 1 | 4 Days | B | With stepper motor | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7060 | ||
792.42 € | 1 | 4 Days | B | With stepper motor | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7060 | ||
792.42 € | 1 | 4 Days | B | With stepper motor | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7200 | ||
1,554.78 € | 1 | 4 Days | C | Stepper motor with control | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.8371 | ||
1,554.78 € | 1 | 4 Days | C | Stepper motor with control | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7820 | ||
1,554.78 € | 1 | 4 Days | C | Stepper motor with control | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7820 | ||
1,554.78 € | 1 | 4 Days | C | Stepper motor with control | 8 | 4 | - | - | 93.5 | 46 | 36 | 26 | 20 | 0.5 | 2 | 0.5 | - | - | 60 | 30 | 36 | 21 | 46 | 28 | 20 | - | 24 | 14 | 24 | 8 | 0.7820 | ||
718.07 € | 1 | 4 Days | A | Without motor | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 0.8479 | ||
846.84 € | 1 | 4 Days | B | With stepper motor | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.1640 | ||
846.84 € | 1 | 4 Days | B | With stepper motor | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.1640 | ||
846.84 € | 1 | 4 Days | B | With stepper motor | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.1640 | ||
846.84 € | 1 | 4 Days | B | With stepper motor | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.1640 | ||
1,609.19 € | 1 | 4 Days | C | Stepper motor with control | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.3450 | ||
1,609.19 € | 1 | 4 Days | C | Stepper motor with control | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.2250 | ||
1,609.19 € | 1 | 4 Days | C | Stepper motor with control | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.2380 | ||
1,609.19 € | 1 | 4 Days | C | Stepper motor with control | 12 | 6 | M6 | 99 | 133 | 75 | 60 | 30 | 15 | 0.8 | 3 | 0.8 | 3 | 3 | 100 | 60 | 60 | 38 | 75 | 29.5 | 25 | 13 | 28 | 15.5 | 30 | 12 | 1.2380 |
Loading...
Version 1 | Short | Item | Positioning table | D2(mm) | 8x2 |
---|---|---|---|---|---|
F1(N) | 60 | RoHS | Yes |
Configure
Basic Attributes
Form
Form definition
D3(mm)
D4(mm)
D5(mm)
L(mm)
L1(mm)
L2(mm)
L3(mm)
L4(mm)
L6(mm)
Mx(Nm)
Mz(Nm)
My(Nm)
M1(Nm)
M2(Nm)
F2(N)
F3(N)
B1(mm)
B2(mm)
B(mm)
H(mm)
H1(mm)
H2(mm)
H3(mm)
H4(mm)
Travel S(mm)
Size
Filter by standard shipping days
Optional Attributes