Shipping Days |
|
---|
?* Information on days to ship and prices
CREATE TOOL
Starting from∗ : | 35.71 € |
---|---|
Min. Shipping Days : | 5 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
Starting from∗ |
Min. Shipping Days : |
R Size(mm) |
Type |
work material |
Blade length (ℓ)(mm) |
Number of flutes(sheet) |
Coating |
Overall Length (L)(mm) |
Underneck length (ℓ1)(mm) |
Shank diameter (d)(mm) |
R Precision(μm) |
Machining Application |
Brand | CREATE TOOL |
---|---|
Product Series | |
Starting from∗ | 35.71 € *Unit price with basic configuration |
Min. Shipping Days : | 5 Days |
R Size(mm) | 1.5 ~ 10 |
Type | Ball |
work material | High Hardness Steel: to HRC55[◎] |
Blade length (ℓ)(mm) | 3 ~ 30 |
Number of flutes(sheet) | 2 |
Coating | For High Hardness (Silicon Group) |
Overall Length (L)(mm) | 60 ~ 160 |
Underneck length (ℓ1)(mm) | - |
Shank diameter (d)(mm) | 6 ~ 20 |
R Precision(μm) | - |
Machining Application | Curved surface / Side / Engraving / R Groove |
Loading...