Shipping Days |
|
---|
?* Information on days to ship and prices
ONDA MFG
Starting from∗ : | 21.12 € |
---|---|
Min. Shipping Days : | 6 Days |
*Unit price with basic configuration
ONDA MFG
Starting from∗ : | 63.10 € |
---|---|
Min. Shipping Days : | 6 Days |
*Unit price with basic configuration
Brand |
---|
Product Series |
CAD |
Starting from∗ |
Min. Shipping Days : |
Main Body Shape |
Main Body Material |
Applicable Fluids |
Nominal Pressure |
Type of Gate Valve |
Supply Side, Connection Type |
Supply Side, Nominal Designation of Piping Thread |
Supply Side, Nominal Designation of Pipe Flange |
Supply Side, Diameter of Piping Thread(φ) |
Control Side Connection Types |
Control SideNominal Pipe Threads |
Control Side Nominal The Pipe Flange |
Control Side Piping Pipe Diameter(φ) |
Handle Shape |
Main Body Lining |
Brand | ONDA MFG | ONDA MFG |
---|---|---|
Product Series | ||
CAD |
| |
Starting from∗ | 21.12 € *Unit price with basic configuration Volume Discount | 63.10 € *Unit price with basic configuration |
Min. Shipping Days : | 6 Days | 6 Days |
Main Body Shape | Straight | Straight |
Main Body Material | - | Stainless Cast Steel |
Applicable Fluids | Water | Water |
Nominal Pressure | - | - |
Type of Gate Valve | - | Internal Thread Type |
Supply Side, Connection Type | Rc(R) | Rc(R) |
Supply Side, Nominal Designation of Piping Thread | 1B ~ 3/4B | 1B ~ 3/4B |
Supply Side, Nominal Designation of Pipe Flange | - | - |
Supply Side, Diameter of Piping Thread(φ) | - | - |
Control Side Connection Types | Rc(R) | Rc(R) |
Control SideNominal Pipe Threads | 1B ~ 3/4B | 1B ~ 3/4B |
Control Side Nominal The Pipe Flange | - | - |
Control Side Piping Pipe Diameter(φ) | - | - |
Handle Shape | Round-shaped handle | Round-shaped handle |
Main Body Lining | - | - |
Loading...