?* Information on days to ship and prices
THK
Min. Shipping Days : | 20 Days |
---|
THK
Min. Shipping Days : | 20 Days |
---|
Brand |
---|
Product Series |
CAD |
Starting from∗ |
Min. Shipping Days : |
Nut type |
Shaft end shape (left) |
Shaft end shape (right) |
Type |
Spline shaft outer diameter D(φ) |
Torque |
Shaft material |
Number of nuts(pcs.) |
Nut length |
Nut Overall Length L1(mm) |
Nut Outer Diameter D1(φ) |
Preload |
Accuracy Grade |
Brand | THK | THK |
---|---|---|
Product Series | ||
CAD |
|
|
Starting from∗ | - | - |
Min. Shipping Days : | 20 Days | 20 Days |
Nut type | Flange Type | Flange Type |
Shaft end shape (left) | Standard | Standard |
Shaft end shape (right) | Standard | Standard |
Type | Solid | Solid / Hollow / Hollow (thin) |
Spline shaft outer diameter D(φ) | - | - |
Torque | High Torque | Medium Torque |
Shaft material | - | - |
Number of nuts(pcs.) | 1 ~ 5 | 1 ~ 5 |
Nut length | Standard | Standard |
Nut Overall Length L1(mm) | 40 | 125 |
Nut Outer Diameter D1(φ) | 23 | 80 |
Preload | Light Preload | Light Preload |
Accuracy Grade | Standard Grade / High Grade / Precision Grade | Standard Grade / High Grade / Precision Grade |
Loading...